Coloured or uncoloured insitu concrete is laid. Selected aggregates
are then broadcast on to the surface. The concrete is then trowelled
to allow the aggregate to bond in to the surface. The surface
is treated with a top surface retarder. This allows the top latents
to be washed away to expose the aggregate. This can be controlled
from a depth of 1-7 mm.